Kozuch Football Performance Complex is a newer facility that Purdue has had issue with keeping the cooling load and chilled water flow to the equipment on the second floor. We worked with Purdue directly for the installation of a booster pump with associated piping and control work to bring their system up to the performance required. A&R scanned the site and prefabricated all of the piping for a quick installation keeping downtime of the existing system to 24hrs so the facility remained in operation throughout construction.